Cotham School Library

June 2, 2015 by Ben Smith

Background

The brief was to replace 8 temporary classrooms with a permanent building that created new accommodation and also formed meaningful external spaces within the setting of the original 1930’s grammar school and sensitive conservation area.

Design

Three external courtyards, top lit classrooms and an abundance of pinboard space within was created. The original building was respected by using low pitched metal roofs on a new single storey composition.

Technical

Masonry walls with timber glulam beams are expressed internally with a steel frame for the mezzanine floor in the library. Rooflights are placed over the internal walls to bounce light into the rooms giving a more defused quality of daylight.

This gallery contains 6 photos

Cotham Sports & Drama

June 2, 2015 by Ben Smith

Background

Three drama studios, six changing rooms, two classrooms and a four badminton courts sports hall extend the original concept of the site layout to contain the end of the playing fields.

Design

Being in a Conservation Area, care has been taken with the external qualities of the building along with enhanced site boundary treatments.

Technical

The building is constructed with a complete steel frame giving the benefits of speeds construction and future flexibility. The Hall is naturally lit giving flexibility of use for the sports hall.

Designed by George Batterham, Kris Eley
Built by Cowlins

This gallery contains 4 photos